Buyers often ask us for a conveyor price per metre. It is a fair question, but a single rate hides most of what drives the cost. A light-duty belt conveyor for small cartons and a stainless steel conveyor for a pharma line can both be ten metres long and still be very different machines. Below are the factors we work through on every quotation.
1. Length, width and layout
Length is the most obvious factor: more metres means more frame, more belt or rollers and more supports. Width matters just as much, because a wider conveyor needs a wider belt, longer rollers and a stiffer frame.
Layout adds cost in ways a price-per-metre figure does not show. Curves, merges, transfers between conveyors, inclines and changes in height each need extra parts and engineering. A straight 12 m run is usually simpler than three 4 m sections joined by two curves.
2. What you are moving, and how much of it
The weight of each product, the load per metre and the number of products per hour set the strength of the whole machine: frame section, roller or belt grade, bearings, shaft sizes and motor power. A conveyor carrying 2 kg cartons is built very differently from one carrying 300 kg castings or loose bulk material.
Product shape and surface matter too. Bags, open trays, round bottles and powders each need a different conveyor type or belt surface, which changes the price.
3. Material of construction: MS, SS or aluminium
Painted or powder-coated mild steel (MS) is the economical choice for most industrial use. Stainless steel (SS) costs more but is needed for food, pharma, wash-down and corrosive areas. Aluminium profile frames sit in between for light loads and assembly lines, and are quick to modify. Our MS vs SS vs aluminium guide explains when each one makes sense.
4. Belt, rollers or chain
The conveying surface is a large share of the cost. PVC belts suit general packaging, PU belts suit food contact, rubber belts suit heavy and abrasive loads, and modular plastic belts suit wash-down and curves. Roller conveyors vary with roller diameter, pitch and finish. Slat and chain conveyors cost more per metre because of the chain, sprockets and slats, but they handle loads a belt cannot.
5. Drive and controls
A simple conveyor may need only a geared motor and a starter. Many lines also need a VFD for speed control, sensors to detect products, emergency stops, and interlocks with the machines before and after it. Zone-controlled roller conveyors, sorting systems and lines connected to a PLC need more electrical and software work. Controls are often where two quotes differ most, so check exactly what is included.
6. Accessories and safety
Side guides, stoppers, pushers, diverters, covers, guards, pull-cord switches, drip trays, work tables and lighting can all be added. Each one is small, but together they can change the total noticeably. Safety guarding at pinch points and drives should never be treated as optional.
7. Installation, transport and site work
Transport, unloading, installation, alignment, commissioning and operator training are part of the real cost. Plant shutdowns, night work, high mezzanines or tight access add time. Civil work, floor anchoring and the electrical supply to the panel are sometimes the buyer's scope, so make sure every quote says who does what.
8. One machine or a complete line
A complete line designed together (conveyors, sealing, weighing and labeling) avoids mismatched heights and speeds that cause jams later. It also usually costs less to engineer once than to fit separate machines together on site. See our automated packaging line page for how this works.
How to compare conveyor quotes fairly
- Same scope: check that each quote covers the same length, width, load, material and accessories.
- Controls in writing: motor make and power, VFD, sensors, panel and emergency stops should be listed.
- Installation: confirm whether transport, installation, commissioning and training are included.
- Lead time and support: ask how long manufacturing takes and how quickly service is available after handover.
- Drawings: a layout drawing with the quote shows the supplier has understood your floor and process.
Where you can save, and where you should not
You can often save by choosing MS instead of SS where hygiene is not needed, using gravity rollers for short manual sections, keeping the layout straight where possible and adding automation in stages. Avoid saving on frame strength, bearings, drive sizing and guarding: undersized conveyors cost more in breakdowns and downtime than they save at purchase.
Getting an accurate quote
The more we know, the closer the first quote is to the final price. Our guide on what to share for a conveyor quote lists everything we ask for, including a simple way to work out the speed you need.