When a quote is based on guesses, the price changes later or the conveyor does not fit the job. Sharing the details below with your first enquiry gets you a realistic design and price the first time, and lets you compare suppliers fairly.
1. The product
- What it is: cartons, bags, bottles, trays, parts, loose bulk material.
- Size: length, width and height of the smallest and largest product.
- Weight: lightest and heaviest product.
- Base and surface: flat, round, soft, oily, hot, sharp or fragile.
- For bulk material: what it is, particle size and bulk density if known.
2. Output
- Products per minute or per hour, or tonnes per hour for bulk.
- Peak output, not just average.
- Number of shifts and hours per day.
3. Layout and heights
- Total length and route, including curves and changes in height.
- Infeed and outfeed heights, and the machines before and after the conveyor.
- Available width, ceiling height, columns and doors in the way.
- A rough sketch or layout drawing with dimensions. Photos and a short video of the area help a lot.
4. Environment
- Dry, dusty, wet, wash-down, chemical, hot or cold area.
- Hygiene requirements (food or pharma).
- Indoor or outdoor.
5. Controls and connections
- Fixed or variable speed.
- Sensors, stoppers, counters, reject devices or diverters needed.
- Connection to other machines or a PLC.
- Available power supply at site.
6. Scope and timeline
- Supply only, or supply with installation, commissioning and training.
- Required delivery date, and any shutdown window for installation.
- Budget range, if you have one; it helps us propose the right level of automation.
How to work out the conveyor speed
For individual products (cartons, packs, bottles), the speed you need depends on the output and the space each product takes on the conveyor:
Speed (m/min) = products per minute ร (product length + gap between products) in metres
Example: you need 30 cartons per minute. Each carton is 0.40 m long and you want a 0.20 m gap between cartons. Speed = 30 ร (0.40 + 0.20) = 18 m/min. We would usually add a margin above this so the conveyor can catch up after a short stop.
How to estimate bulk capacity
For loose material on a belt, capacity in tonnes per hour is:
Capacity (t/h) = 3.6 ร load per metre (kg/m) ร belt speed (m/s)
Example: 20 kg of material on each metre of belt at 1.0 m/s gives 3.6 ร 20 ร 1.0 = 72 t/h. The load a belt can carry per metre depends on its width, troughing and the material, so we confirm this during design.
Where to send it
Send the details through our enquiry form, or share photos, videos and drawings on WhatsApp. If some details are not known yet, send what you have; we will ask for the rest.